ACADIA POLYMERS
Clifton Forge, VA.
Installed new hoist and controls on existing plating system. (Jessup)
 
A-DEC
Newburg, OR.
Installed double lane zinc basket line with (2) hoist. (Jessup) 
 
APMM 
Guntown, MS.
Installed double lane superstructure W/overhead walkway and 4 hoist. (Jessup) 
 
APOLLO PLATING
Roseville, MI.
(2002) - Service call to do some steam piping. (Jessup)
(2002) - Service call to rework existing boiler system. (Jessup)

Taylor, MI.
(2003) - Re-arranged tanks for new process. Re-bussed, piped, and wired to new layout.
(2004) - Provide and install new catwalk system.
(2004) - Installed 2 new hoists and controls to an existing line.

 
ARLINGTON PLATING
Palitine, IL
(2012) - Upgrade existing line with new hoist and controls. (Jessup)
 
ARROW CRYOGENICS
Blaine, MN.
Installed waste treatment system. (DMP)
 
BARRY CONTROLS
Boston, MS.
Removed existing 50' phos plating line (NIC)
 
Baycote
Mishawaka, IN.
Installed new barrel drive controls to an existing line (Jessup)
 
BD Medical
Columbus, NE
Installed new waste treatment system (DMP) 
 
Big Red
Grand Rapids, MI.
Revamp existing line (NIC)
 
BORG WARNER
Ithaca, NY.
Installed waste treatment system. (DMP)
 
BRENNER TOOL
Bensalem, PA.
Installed weast treatment system (DMP)   
 
BRIDGESTONE
Upper Sandusky, OH.
Add a new tank and hoist to existing phos barrel line. (Jessup) 
 
CARDONE INDUSTAL
Philadelphia, PA.
Replace existing phos tank with new. (Jessup)
 
CESSNA AIRCRAFT
Columbus, GA.
Installed new inline dryer. (Jessup)
 
Chemetall
Jacksom, MI.
(2012) - Installed weast water treatment system (DMP) 
 
CHEM PLATE
Elk Grove, IL.
(2003) - Replace 8 sta. zinc plate tank and hoist controls. (Jessup)
(2005) - Installed 100' oven & replaced existing load/unload equipment on existing line. (Jessup) 
 
CLASSIC PLATING
Jackson, MI.
Added tank with services to existing rack line. (Jessup)
 
COMMONWEALTH
Detroit, MI.
Installed new plating system (Jessup)
 
COMPEX
Mauldin, SC.
Install 4 lane system with 7 hoist. (NIC)
 
COMPEX NATIONAL
Mauldin, SC.
Install double line zinc system. (NIC)
 
CONNECTOR SERVICE
Elgin, IL..
(2001) - Provided 2 electricians to help in moving 2 plating systems (NIC)
(2001) - Prodided 1 rigger to help with install (NIC)
 
CONTINENTAL TEVES
Fletcher, NC.
Installed 2 lane zinc/nickel rack line with 4 hoist and accessory equipment.(Jessup) 
 
COOPER TIRE
Eldorado, ARK.
(2001) - Installed single lane zinc plating system (Jessup)
(2001) - Installed waste treatment. (J-Mark)
 
C. R. HUDGINS
Lynchburg, VA.
(2006) - Install new 2 hoist zinc rack plating system. (Jessup)  
(2009) - Install new 1 hoist zinc rack plating system. (Jessup)  
 
Dakota Tube
Watertown, SD
(2010) - Installed 60' doublewide zinc rack line. (Jessup) 

(2012) - Upgrade existing rack line with new filter, hoist and controls. (Jessup)
(2013) - Upgrade existing rack line with filter, hoist and controls. (Jessup)
 
DANAHER TOOL
Gastonia, NC
Installed pre-modularized hoist system. (NCA)
 
DB METALS
Rockford, IL.
(2004) - Installed single lane zinc barrel plating system. (Jessup) 

(2004) - Installed new shuttle and 2 new dryers to an existing line. (Jessup)
(2004) - Installed new hoist controls to an existing line.
(2004) - Installed power feeds to rectifiers and copper busing to tanks. 
 
Dew Engineering
Ottawa, Ontario Canada.
(2012) Installed new plating and boiler system. (Jesuup)
 
ELDRE
Rochester, NY.
Installed waste treatment system. (DMP)
 
ELM PLATING
Jackson, MI.
(2000) - Replace 2 plate tanks on rack line.
(2001) - Installed new waste treatment system (J-Mark)
(2001) - Installed a self contained oven.
(2001) - Re-ppiped 2 evaporator drains and air piping.
(2002) - Set, piped, and wired 5 new tanks to existing line. (Jessup)
(2004) - Installed saddle shunt monitoring system to existing zinc barrel line. (Jessup)
(2005) - Installed three tanks complete with services, water, level controls, and steam. (Jessup)
(2006) - Added a 2000 amp rectifier to existing zinc barrel line.
(2007) - Rebuilt 4 Desco centrical dryers in our shop including bearings and races replacement.
(2012) - Upgrade existing line with 6 new dryers and tanks. (Jessup)
 
E/M COATINGS
(       ) - Shelby Twnp., MI. Installed waste treatment system. (DMP)
(2012) - Lombard, IL. - Installing complete Jessup line
 
ESAB Welding
Florence, SC.
(2012) Installed waste treatment system. (DMP)
 
FAIRFIELD
Lafayette, IL.
(2013) - Install new one hoist basket/rack line.. (Jessup)
 
FEDERAL MOGUL
Boaz, AL.
(2001) - Installed single lane plating system. (NCA)
(2002) - Installed single lane plating system. (Jessup)
(2008) - Modified an existing line. (NIC)
 
FINTEX
Inkster, MI.
Installed catwalks, operator remote panel, light curtains, e-stop's, and dryers. (Jessup)
 
FPM
Rockford, IL.
(2001) - Installed new double lane plating system.
(2001) - Installed waste treatment system (DMP)
(2001) - Installed trench piping between waste treatment and new plating system.
(2002) - Provide and install shuttle guarding.
 
FREUDENBURG-NOK
Bristol, NH.
(2003) - Installed single lane phos barrel line plating system. (Jessup)
(2003) - Installed additional hoist and controls to existing phos barrel line. (Jessup)
 
FUTURE FINISHING
Hamilton, OH.
Assembled 3 hoist and installed on existing system. (CHC)
 
GATES RUBBER
Versallies, MO.
(2002) - Service call to repair/replace existing piping. (Jessup)
(2005) - Installed 4 new hoist & controls and chemical feed system on existing line. (Jessup)
 
GENERAL PRODUCTS
Columbus, OH.
(2006) - Relocate existing Udylite machine to Columbus, OH. Also provided a new tank. (NIC)
(2006) - Fabricate one new steel tank in our shop then sent to project. (NIC)
 
GENE's PLATING
Los Angeles, CA.
Installed waste treatment system. (DMP)
 
GKN
Sanford, NC.
Installed new hoist rails, hoists, and controls to existing plating system (Jessup)
 
Hitachi
Berea, KY.
Replace hoist, plate tank, and relocating, also added additional rectifier complete with new bussing (Jessup)
 
HI-TECH
Detroit, MI.
Installed new load/unload equipment and hoist. (Jessup)
 
HOHMAN
Dayton, OH.
Installed single lane nickel side arm plating system on 2nd. floor of building. (FPI)
 
HOLMAC MANUFACTUE
Omand Beach, FL.
Installed waste treatment system (DMP)
 
JD PLATING
Madison, MI.
Installed single lane zinc plating system. (Jessup)
 
JOHN DEER
Toana, VA..
(2002) - Install waste treatment system. (DMP)
(2002) - Installed hot water boiler system.
 
JUPITER ALUMINUM
Fairfield, IN.
Installed waste treatment system. (DMP)
 
KOBE ALUMINUM PRODUCTS   
Bowling Green, KY.
Install single line system. (Jessup)
 
LAIRD TECH
Deleware Gap, PA.
Installed single lane tin rack/barrel system. (NCA)
 
LINCOLN PLATING
Lincoln, NE.

(2003) - Service call to provide and install steam coil piping. (Jessup)
(2006) - Replace existing hoist rails and 2 new hoist with controls. (Jessup)
 
LINETEC ANODIZE
Wausau, WI.
Installed waste treatment system. (DMP)
 
LITTLE FUSE
Des Plaines, IL.
Provided iron worker to (NIC)
 
ORSCHELN PRODUCTS
Moberly, MO.
(2007) - Installed new 2 lane zinc barrel line with 2 hoist. (Jessup)
(2007) - Installed new waste treatment system. (J-Mark)
 
OSRAM SYLVANIA
Versaille, KY.
Installed waste treatment system. (DMP)
 

MACI
 Parma, MI
(2012) - Converting existing Napco line to Jessup line with new hoists & controls and  
            load/unload. (Jessup)

 
McKECHINE
Lexington, KY.
Remove and replace 5 process tanks on existing plating system.
 
METAL IMPACT
Elk Grove, IL.
Installed 1 new hoist and controls to existing system. (Jessup)
 
MILLIER WELDING
Grandville, MI.
(2002) - Fabricate 46 powder coated drum carts.
(2002) - Fabricate 35 powder coated drum carts.
(2003) - Fabricate 35 powder coated drum carts.
(2004) - Fabricate 40 powder coated drum carts.
(2004) - Fabricate 40 powder coated drum carts.
(2005) - Fabricate 40 powder coated drum carts.
(2006) - Fabricate 40 powder coated drum carts.
(2008) - Fabricate 25 powder coated drum carts.   
 
MITSUBISHI
Mason, OH.
Installed waste treatment system (DMP)

Orlando, FL.
Install 2 single lane plating systems and waste treatment (NCA)

 
MOTOROLA
Ft. Lauderdale, FL..
Installed waste treatment system. (DMP)
 
NICO PLATING
Minneapolis, MN.
Installed new overhead super structure and (2) automated hoist with controls (Jessup)
 
NICRO PLATING
Detroit, MI.
(2002) - Installed overhead structure, 2 hoist and controls. (Jessup)
(2003) - Bussed new 4K rectifier, Pipe and wired.
(2005) - Installed new hoist and rectifier controls. (Jessup)
 
NTN - DRIVESHAFT
Columbus, IN.
(2004) - Installed single lane phos barrel plating system and boiler system. (Jessup)

(2005) - Upgrade existing ventilation system. (Jessup)
 
PRECISION ALLOYS
Raleigh, NC.
Installed single lane zinc rack plating system. (NCA)
 
PROFESSIONAL PLATING
Brillion, WI.
Supervise the installation of new track & frame and load/unload equipment. (Jessup)
 
PROFILES    
Palmer, MA.
Install piping and wirig on a double tank line (M.E. Baker)
 
ROY METAL FINISHING    
Greenville, SC.
Removed e-coat machine in Muskegon, MI. and moved it to Greenville, SC.
 
SAPORITO FINISHING
Ciceri, IL.
Modified existing single lane tank line
 
SARGENT PLATING
New Haven, CT.
Installeded track and frame over existing plating system. (NCA)
 
SENIOR FLEXONICS
Bartlett, IL.
Installed waste treatment system. (DMP)
 
SKF SEALING SOLUTIONS
Seneca, KS.
(2008) - Installed a used plating system. (NIC)

Elfin, IL.
(2008) - Removed existing line to relocation. (NIC)
 
SNAP-ON TOOLS
Elizabethton, TN.
(2000) - Install waste treatment system (DMP)
(2004) - Convert an existing single barrel phos line to black oxide. (Jessup)

Milwaukee, WI.
(2007) - Remove, rebuild, and reinstall arms on existing Udylite return machine.
 
SOUTH HOLLAND METAL FINISHING
Monee, IL.
(2012) - Install complete zinc barrel with load/unload and dryers.
 
SOUTHWEST METALS
New Berlin, WI.
(2000) - Installed plating system (Jessup)
(2002) - Installed 2 hoist and new controls to existing plating system. (Jessup)
(2004) - Installed double lane zinc/nickel rack line (Jessup) 
 
SPEC PLATING
Minneapolis, MN.
Installed waste treatment system. (DMP)
 
SQUARE D
Columbia, MO.
Installed 4 new hoists & controls to existing system. (Jessup) 
 
SPRINGCO
Cleveland, OH.
Install waste treatment system. (NIC)
 
SPX CORPORATION
Owatonna, MN.
Installed double lane black oxide line and waste treatment system.. (NCA)
 
SUPERIOR COATINGS
Elizabethtown, KY.
Installed 2 lane zinc barrel system and oven system. (Jessup)
 
SUPERIOR METAL FINISHING
Cleveland, OH.
Installed (2) electric centrical dryers to replace (1) bulk dryer. (Jessup)
 
TOKICO USA
Berea, KY.
(2003) - Installed 2 lane zinc rack plating ststem. (Jessup)
(2004) - Installed two additional hoist & controls to line installed in 2003.
(2005) - Rewoked zinc barrel line for new process. (Jessup)
(2006) - Install 2 new plate tanks and rectifier to existing zinc rack line.
(2006) - New hoist rails & 2 new hoist and controls on chrome rack line. (Jessup)
(2008) - Revamp existing line with new rails, hoist and controls. (Jessup)
 
TOMPKINS
Batavia, NY.
Installed track & frame, set tank modules and mezzinine. (Jessup)
 
TRW
Vonore, TN.
Installed waste treatment system. (DMP)
 
UNIVERSAL COATINGS
Flint, MI.
Add addition support to existing hoist rails on their zinc barrel line. (Jessup)
 
WOLVERINE
Roseville, MI.
Installed 2 new hoist and controls to existing plating system. (Jessup)
 

 

 