|
ACADIA POLYMERS
Clifton Forge, VA.
Installed new hoist and controls on existing plating system. (Jessup) |
|
A-DEC
Newburg, OR.
Installed double lane zinc basket line with (2) hoist.
(Jessup)
 |
|
APMM
Guntown, MS.
Installed double lane superstructure W/overhead walkway and 4
hoist. (Jessup)
 |
|
APOLLO PLATING
Roseville, MI.
(2002) - Service call to do some steam piping. (Jessup)
(2002) - Service call to rework existing boiler system.
(Jessup)
Taylor, MI.
(2003) - Re-arranged tanks for new process. Re-bussed, piped,
and wired to new layout.
(2004) - Provide and install new catwalk system.
(2004) - Installed 2 new hoists and controls to an existing
line. |
|
ARLINGTON
PLATING
Palitine, IL
(2012) - Upgrade existing line with new hoist and controls. (Jessup) |
|
ARROW
CRYOGENICS
Blaine, MN.
Installed waste treatment system. (DMP) |
|
BARRY CONTROLS
Boston, MS.
Removed existing 50' phos plating line (NIC) |
|
Baycote
Mishawaka, IN.
Installed new barrel drive controls to an existing line (Jessup) |
|
BD Medical
Columbus, NE
Installed new waste treatment system (DMP)
 |
|
Big Red
Grand Rapids, MI.
Revamp existing line (NIC) |
|
BORG WARNER
Ithaca, NY.
Installed waste treatment system. (DMP) |
|
BRENNER TOOL
Bensalem, PA.
Installed weast treatment system (DMP) |
|
BRIDGESTONE
Upper Sandusky, OH.
Add a new tank and hoist to existing phos barrel line.
(Jessup)
 |
|
CARDONE
INDUSTAL
Philadelphia, PA.
Replace existing phos tank with new. (Jessup) |
|
CESSNA AIRCRAFT
Columbus, GA.
Installed new inline dryer. (Jessup) |
|
Chemetall
Jacksom, MI.
(2012) -
Installed weast water treatment system (DMP) |
|
CHEM PLATE
Elk Grove, IL.
(2003) - Replace 8 sta. zinc plate tank and hoist controls.
(Jessup)
(2005) -
Installed 100' oven & replaced existing load/unload
equipment on existing line. (Jessup)
 |
|
CLASSIC PLATING
Jackson, MI.
Added tank with services to existing rack line. (Jessup) |
|
COMMONWEALTH
Detroit, MI.
Installed new plating system (Jessup) |
|
COMPEX
Mauldin, SC.
Install 4 lane system with 7 hoist. (NIC) |
|
COMPEX NATIONAL
Mauldin, SC.
Install double line zinc system. (NIC) |
|
CONNECTOR
SERVICE
Elgin, IL..
(2001) - Provided 2 electricians to help in moving 2 plating
systems (NIC)
(2001) - Prodided 1 rigger to help with install (NIC) |
|
CONTINENTAL
TEVES
Fletcher, NC.
Installed 2 lane zinc/nickel rack line with 4 hoist and
accessory equipment.(Jessup)
 |
|
COOPER TIRE
Eldorado, ARK.
(2001)
- Installed single lane zinc plating system (Jessup)
(2001) - Installed waste treatment. (J-Mark) |
|
C. R. HUDGINS
Lynchburg, VA.
(2006) -
Install new 2 hoist zinc rack plating system. (Jessup)

(2009) - Install new 1 hoist zinc rack plating system. (Jessup) |
|
Dakota Tube
Watertown, SD
(2010) -
Installed 60' doublewide zinc rack line. (Jessup)

(2012) - Upgrade
existing rack line with new filter, hoist and controls.
(Jessup)
(2013) - Upgrade existing
rack line with filter, hoist and controls.
(Jessup) |
|
DANAHER TOOL
Gastonia, NC
Installed pre-modularized hoist system. (NCA) |
|
DB METALS
Rockford, IL.
(2004) - Installed single lane zinc barrel plating system.
(Jessup)

(2004) - Installed new shuttle and 2 new dryers to an existing
line. (Jessup)
(2004) - Installed new hoist controls to an existing line.
(2004) - Installed power feeds to rectifiers and copper busing
to tanks. |
|
Dew Engineering
Ottawa, Ontario Canada.
(2012)
Installed new plating and boiler system. (Jesuup) |
|
ELDRE
Rochester, NY.
Installed waste treatment system. (DMP) |
|
ELM PLATING
Jackson, MI.
(2000) - Replace 2 plate tanks on rack line.
(2001) - Installed new waste treatment system (J-Mark)
(2001) - Installed a self contained oven.
(2001) - Re-ppiped 2 evaporator drains and air piping.
(2002) - Set, piped, and wired 5 new tanks to existing line.
(Jessup)
(2004) - Installed saddle shunt monitoring system to existing
zinc barrel line. (Jessup)
(2005) - Installed three tanks complete with services, water,
level controls, and steam. (Jessup)
(2006) - Added a 2000 amp rectifier to existing zinc barrel
line.
(2007) - Rebuilt 4 Desco centrical dryers in our shop including
bearings and races replacement.
(2012) - Upgrade existing line with 6 new dryers and tanks.
(Jessup) |
|
E/M COATINGS
( ) -
Shelby Twnp., MI.
Installed waste treatment system. (DMP)
(2012) - Lombard, IL. - Installing complete Jessup line |
|
ESAB Welding
Florence, SC.
(2012)
Installed waste treatment system. (DMP) |
|
FAIRFIELD
Lafayette, IL.
(2013)
- Install new one
hoist basket/rack line.. (Jessup) |
|
FEDERAL MOGUL
Boaz, AL.
(2001)
- Installed single lane plating system. (NCA)
(2002) - Installed single lane plating system. (Jessup)
(2008) - Modified an existing line. (NIC) |
|
FINTEX
Inkster, MI.
Installed catwalks, operator remote panel, light curtains,
e-stop's, and dryers. (Jessup) |
|
FPM
Rockford, IL.
(2001)
- Installed new double lane plating system.
(2001) - Installed waste treatment system (DMP)
(2001) - Installed trench piping between waste treatment and new
plating system.
(2002) - Provide and install shuttle guarding. |
|
FREUDENBURG-NOK
Bristol, NH.
(2003) - Installed single lane phos barrel line plating system. (Jessup)
(2003) - Installed additional hoist and controls to existing
phos barrel line. (Jessup) |
|
FUTURE
FINISHING
Hamilton, OH.
Assembled 3 hoist and installed on existing system. (CHC) |
|
GATES RUBBER
Versallies, MO.
(2002) - Service call to repair/replace existing piping. (Jessup)
(2005) - Installed 4 new hoist & controls and chemical feed
system on existing line. (Jessup) |
|
GENERAL
PRODUCTS
Columbus, OH.
(2006) -
Relocate existing Udylite machine to Columbus, OH. Also
provided a new tank. (NIC)
(2006) - Fabricate one new steel tank in our shop then sent to
project. (NIC) |
|
GENE's PLATING
Los Angeles, CA.
Installed waste treatment system. (DMP) |
|
GKN
Sanford, NC.
Installed new hoist rails, hoists, and controls to existing
plating system (Jessup) |
|
Hitachi
Berea, KY.
Replace hoist, plate tank, and relocating, also added
additional rectifier complete with new bussing (Jessup) |
|
HI-TECH
Detroit, MI.
Installed new load/unload equipment and hoist. (Jessup) |
|
HOHMAN
Dayton, OH.
Installed single lane nickel side arm plating system on 2nd.
floor of building. (FPI) |
|
HOLMAC
MANUFACTUE
Omand Beach, FL.
Installed waste treatment system (DMP) |
|
JD PLATING
Madison, MI.
Installed single lane zinc plating system. (Jessup) |
|
JOHN DEER
Toana, VA..
(2002) -
Install waste treatment system. (DMP)
(2002) - Installed hot water boiler system. |
|
JUPITER
ALUMINUM
Fairfield, IN.
Installed waste treatment system. (DMP) |
|
KOBE ALUMINUM
PRODUCTS
Bowling Green, KY.
Install single line system. (Jessup) |
|
LAIRD TECH
Deleware Gap, PA.
Installed single lane tin rack/barrel system. (NCA) |
|
LINCOLN PLATING
Lincoln, NE.
(2003) - Service call to provide and install steam coil piping.
(Jessup)
(2006) -
Replace existing hoist rails and 2 new hoist with controls.
(Jessup) |
|
LINETEC ANODIZE
Wausau, WI.
Installed waste treatment system. (DMP) |
|
LITTLE FUSE
Des Plaines, IL.
Provided iron worker to (NIC) |
|
ORSCHELN
PRODUCTS
Moberly, MO.
(2007) -
Installed new 2 lane zinc barrel line with 2 hoist. (Jessup)
(2007) -
Installed new waste treatment system. (J-Mark) |
|
OSRAM SYLVANIA
Versaille, KY.
Installed waste treatment system. (DMP) |
|
MACI
Parma, MI
(2012) - Converting existing
Napco line to Jessup line with new hoists &
controls and
load/unload.
(Jessup) |
|
McKECHINE
Lexington, KY.
Remove and replace 5 process tanks on existing plating system. |
|
METAL IMPACT
Elk Grove, IL.
Installed 1 new hoist and controls to existing system. (Jessup) |
|
MILLIER WELDING
Grandville, MI.
(2002) - Fabricate 46 powder coated drum carts.
(2002) - Fabricate 35 powder coated drum carts.
(2003) - Fabricate 35 powder coated drum carts.
(2004) - Fabricate 40 powder coated drum carts.
(2004) - Fabricate 40 powder coated drum carts.
(2005) - Fabricate 40 powder coated drum carts.
(2006) - Fabricate 40 powder coated drum carts.
(2008) - Fabricate 25 powder coated drum carts. |
|
MITSUBISHI
Mason, OH.
Installed waste treatment system (DMP)
Orlando, FL.
Install 2 single lane plating systems and waste treatment
(NCA) |
|
MOTOROLA
Ft. Lauderdale, FL..
Installed waste treatment system. (DMP) |
|
NICO PLATING
Minneapolis, MN.
Installed new overhead super structure and (2) automated hoist
with controls (Jessup) |
|
NICRO PLATING
Detroit, MI.
(2002) - Installed overhead structure, 2 hoist and controls.
(Jessup)
(2003) - Bussed new 4K rectifier, Pipe and wired.
(2005) - Installed new hoist and rectifier controls. (Jessup) |
|
NTN -
DRIVESHAFT
Columbus, IN.
(2004) - Installed single lane phos barrel plating system and
boiler system. (Jessup)

(2005) - Upgrade existing ventilation system. (Jessup) |
|
PRECISION
ALLOYS
Raleigh, NC.
Installed single lane zinc rack plating system. (NCA) |
|
PROFESSIONAL
PLATING
Brillion, WI.
Supervise the installation of new track & frame and
load/unload equipment. (Jessup)
 |
|
PROFILES
Palmer, MA.
Install piping and wirig on a double tank line (M.E. Baker) |
|
ROY METAL
FINISHING
Greenville, SC.
Removed e-coat machine in Muskegon, MI. and moved it to
Greenville, SC. |
|
SAPORITO
FINISHING
Ciceri, IL.
Modified existing single lane tank line |
|
SARGENT PLATING
New Haven, CT.
Installeded track and frame over existing plating system. (NCA) |
|
SENIOR
FLEXONICS
Bartlett, IL.
Installed waste treatment system. (DMP) |
|
SKF SEALING
SOLUTIONS
Seneca, KS.
(2008) -
Installed a used plating system. (NIC)
Elfin, IL.
(2008) - Removed existing line to relocation. (NIC) |
|
SNAP-ON TOOLS
Elizabethton, TN.
(2000) - Install waste treatment system (DMP)
(2004) - Convert an existing single barrel phos line to black
oxide. (Jessup)
Milwaukee, WI.
(2007)
- Remove, rebuild, and reinstall arms on existing Udylite return
machine. |
|
SOUTH HOLLAND
METAL FINISHING
Monee, IL.
(2012) - Install complete
zinc barrel with load/unload and dryers. |
|
SOUTHWEST
METALS
New Berlin, WI.
(2000) - Installed plating system (Jessup)
(2002) - Installed 2 hoist and new controls to existing plating
system. (Jessup)
(2004)
- Installed double lane zinc/nickel rack line (Jessup)
 |
|
SPEC PLATING
Minneapolis, MN.
Installed waste treatment system. (DMP) |
|
SQUARE D
Columbia, MO.
Installed 4 new hoists & controls to existing system. (Jessup)
 |
|
SPRINGCO
Cleveland, OH.
Install waste treatment system. (NIC) |
|
SPX CORPORATION
Owatonna, MN.
Installed double lane black oxide line and waste treatment
system.. (NCA) |
|
SUPERIOR
COATINGS
Elizabethtown, KY.
Installed 2 lane zinc barrel system and oven system. (Jessup) |
|
SUPERIOR METAL
FINISHING
Cleveland, OH.
Installed (2) electric centrical dryers to replace (1) bulk
dryer. (Jessup) |
|
TOKICO USA
Berea, KY.
(2003) - Installed 2 lane zinc rack plating ststem. (Jessup)
(2004) - Installed two additional hoist & controls to line
installed in 2003.
(2005) - Rewoked zinc barrel line for new process. (Jessup)
(2006) - Install 2 new plate tanks and rectifier to existing
zinc rack line.
(2006) - New hoist rails & 2 new hoist and controls on chrome
rack line. (Jessup)
(2008) - Revamp existing line with new rails, hoist and
controls. (Jessup) |
|
TOMPKINS
Batavia, NY.
Installed track & frame, set tank modules and mezzinine. (Jessup) |
|
TRW
Vonore, TN.
Installed waste treatment system. (DMP) |
|
UNIVERSAL
COATINGS
Flint, MI.
Add addition support to existing hoist rails on their zinc
barrel line. (Jessup) |
|
WOLVERINE
Roseville, MI.
Installed 2 new hoist and controls to existing plating system. (Jessup) |
|